Eastbank Academy
Status
Complete
Project Type
School
Date
August 2026
Location
Glasgow

Project description
CY Turf replaced the 3G pitch at Eastbank Academy in Glasgow, working with AMEY.
We lifted and removed the existing 3G surface. We then installed a new Icon-S 40-115 system, supplied by Act Sports. Icon-S is made with Beaulieu sports yarn. It gives good coverage across the surface, which reduces infill splash and migration. It’s also built for long-term durability.
The full replacement was completed and handed over within two weeks, in time for the start of the new school term in August 2026.
We delivered the project alongside AMEY and Act Sports.
Key Details
- Location: Glasgow.
- Sector: School/Education.
- Job Spec: Full 3G playing surface.